From: "Jacques van Oene" <j.vanoene@chello.nl>
Newsgroups: sci.space.news
Subject: ISS On-Orbit Status, 29-05-2003
Date: Tue, 3 Jun 2003 18:52:28 +0200
Organization: Jet Propulsion Laboratory - Pasadena CA
Approved: sci-space-news@zagami.jpl.nasa.gov
Message-ID: <00af01c329f0$84742580$d1cd5dd5@chello.nl>
	charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
X-Trace: nntp1.jpl.nasa.gov 1054659112 4270 137.78.16.91 (3 Jun 2003 16:51:52 GMT)
X-Complaints-To: news@newsfeed.jpl.nasa.gov
NNTP-Posting-Date: 3 Jun 2003 16:51:52 GMT
X-Priority: 3
X-MSMail-Priority: Normal
X-Mailer: Microsoft Outlook Express 5.00.2615.200
X-MIMEOLE: Produced By Microsoft MimeOLE V5.00.2615.200
Originator: daemon@zagami.jpl.nasa.gov
Xref: newsread1.funet.fi sci.space.news:13625

ISS On-Orbit Status 29 May 2003

 All ISS systems continue to function nominally, except as noted previously
or below.

Both crewmembers today performed Part 2 of the IMG PHS (Integrated Medical
Group/Periodic Health Status) tests without blood labs, each one acting
first as the examining CMO (crew medical officer) and then becoming the
examined subject.  [Guided by special software (IFEP, in-flight examination
program) on the medical equipment computer (MEC), the tests were performed
with equipment from the crew's ambulatory medical pack (AMP) and advanced
life support pack (ALSP).  All PHS data were recorded by the two CMOs on the
IFEP, using the same forms started by them yesterday during the MO-9
assessment.]

Later in the day, with Ed Lu's assistance, CDR Yuri Malenchenko also
completed the MO-5 MedOps protocol of cardiovascular evaluation during
graded exercises on the VELO cycle ergometer, which had been deferred last
week (5/22).  [In this first (for him) session, Malenchenko used the Gamma-1
ECG equipment with biomed harness, skin electrodes, and a blood pressure and
rheoplethysmograph cuff wired to the cycle ergometer's instrumentation
panels.  For the graded exercise, he worked the pedals after a prescribed
program at load settings of 125, 150, and 175 watts for three minutes each.
All measurements were recorded and telemetered during Daily Orbit 1 to
MCC-M, from where the workout was controlled by a specialist.]

After FE/SO Edward Lu set up the video camcorder for the subsequent
Educational Payload Operations (EPO) session, the crew performed (and
recorded) great zero-G flight demonstrations of paper airplanes and
particularly of a model of the Wright Flyer.  [The crew had prepared for the
event with an OBT (on-board training CD-ROM) on 5/18.  As special topic for
the education community and the approaching 100th anniversary of the Wright
Brother's first flight, the small (10 inch wingspan, mass <2 ounces) replica
of the Wright Flyer was built by students at Orono Middle School in Orono,
Maine, with science teacher Richard Glueck, using toothpicks, birch stirring
sticks and rip-stop nylon. The model was packed in a special NASA-built
cushioning container and launched on Soyuz 6S with the Expedition 7 crew.]

The brief troubleshooting of the MSG (Microgravity Science Glovebox) was
successful.  The MSG is functioning nominally, and five InSPACE
(Investigating the Structure of Paramagnetic Aggregates from Colloidal
Emulsions) experiment runs are being scheduled for next week.  [The rack,
which had not been power-cycled on 5/27 came up without hitch this morning
when powered up. The 5/27 curtailment of the planned test run was due to an
off-nominal pressure indication during the rack's activation.  Telemetry had
indicated a higher-than-expected delta-pressure for the MSG work volume.
The MSG work volume usually exhibits a slight negative pressure (erroneously
reported as "increase" on 5/28) after fans are turned on in order to prevent
outflow in case of leak.  In this case, no pressure drop was indicated,
probably because of what now is thought to have been a control software
"hang-up".]

The Science Officer again took the 24-hr. noise measurements of the static
acoustic dosimeter deployed on 5/27.

Ed Lu also performed another one of the weekly inventory audits of the
available CWCs (collapsible water containers) and their contents.  [Last
time done: 5/23].

Yuri Malenchenko conducted his regular daily monitoring/servicing of the
BIO-5 Rasteniya-2 ("Plants-2") zero-G plant growth experiment, checking
water level in the Lada-2 greenhouse water container and the seed status.
Today, he also transferred the accumulated data files to the payload laptop
3 for subsequent downlink via Regul-Packet.

The CDR tagged up with MCC-Moscow, via S-band, for the periodic IMS
(inventory management system) "negotiation" conference, then prepared the
daily IMS delta file for automatic export/import to update the database.
Later, he also conducted the daily routine maintenance of the SM's SOZh life
support system (including ASU toilet facilities)

At 10:45am EDT, both crewmembers participated in two interactive televised
PAO interviews (Ku-band and S-band) on WABC-TV, New York, and KNX Radio, Los
Angeles, CA, each one lasting about ten minutes.

Ed and Yuri today also had their weekly conference with the JSC Astronaut
Office (Kent Rominger).

Both crewmembers performed their regular daily physical exercise (2.5 hrs)
on TVIS, RED, CEVIS and VELO (for Yuri's MO-5 test).

Overnight, the newly installed storage battery #8 in the Service Module was
successfully tested, and it is now fully operational on line.  [The SM has
another failed 800A battery (#4) and one with degraded capacity (#2), out of
eight total.]

After yesterday's cooling problem during the EVA don/doff dryrun, Ed Lu's
EMU (extravehicular mobility unit) suit is currently considered "No Go" for
use.  Troubleshooting on the ground continues.  [Because of the curtailment
of the dry-run when Lu could not establish coolant water flow, SAFER
(simplified aid for EVA rescue) donning was demonstrated only by
Malenchenko, and  Airlock/Crewlock (AL/CL) ingress and hatch closure were
not performed.]

Contrary to yesterday's report, EMU battery maintenance discharge on 5/28
did not go as planned, apparently due to a problem with the controlling
laptop. [Troubleshooting is scheduled for next Monday (6/2).  During this
procedure, the SSC (station support computer) will be operated in DOS mode
in order to prevent possible erroneous interactions with Windows mode.  If
the SSC6 laptop is unsuccessful in initiating the EMU battery discharge,
SSC6 may be suspect, and a second SSC laptop will be utilized.]

In a test to verify good communications between the Loop A PCVP (pump and
control valve package) of the ETCS (external thermal control system) and its
controlling MDMs (multiplexer/demultiplexers, i.e., computers), MCC-H will
power on the firmware of the PCVP, preparatory to the ETCS' activation on
Mission 12A.1.  The pump itself will not be spun up.  [Loop A will remain in
this configuration for the foreseeable future, while power is available.
The Loop B PCVP will have its firmware powered on following the S1/P1
software upload in the near future.].

MCC-H/Avionics personnel today are conducting a mission configuration test
of the S1/P1 truss element software upgrade, release 2 (R2), in preparation
for its uplink in the near future.

To better manage carbon dioxide (CO2) reduction on board, an agreement has
been reached between Houston and Moscow to cycle the Vozdukh CO2 scrubber
between Mode 3 (night) and Mode 5 (day).  [In Mode 3, Vozdukh switches
between its two regenerative adsorbent cartridges every 20 minutes.  In Mode
5, the switch cycle is reduced to 10 minutes.  Vozdukh was originally
designed for three filter channels, but the third has never been
functional.]

As a result of the improved CO2 handling, ppCO2 (partial CO2 pressure in the
air) has come down to 3 mmHg in the SM this morning.  In the Lab, the U.S.
CDMK (CO2 monitoring kit) measured 3.2 mmHg in the morning.  Thanks to a
"zero" calibration performed on the MCA (major constituent analyzer)
yesterday, which corrected its readings down by 0.2 mmHg from earlier
measurements, the difference between the MCA and CDMK instruments now has
shrunk to 0.3 mmHg.  [Hard Flight Rule limit: 7.6 mmHg.]

Tomorrow's conjunctions (close encounters) with the Megsat satellite (object
#25722) will require a debris avoidance maneuver (DAM).   [Further
ahead-calculations of the three passes are showing all of them within the
"Red box" (collision probability greater than 0.0001, one in ten thousand),
with the closest miss distance, for the second conjunction at 4:54-4:55pm
EDT, today estimated to be 8 meters.  TCA (time of closest approach) for the
other two passes are 3:22pm and 6:27pm.  Maneuver commands have already been
put in the system for uplink to the SM computer as a PPL (pre-positioned
load) file.  The avoidance burn of ~1 m/s will be performed by Progress 10P
thrusters, using props from its refueling tanks.  This requires the burn to
be executed over Russian ground sites (RGS) to be real-time monitored, and
this sets the time for the DAM tomorrow, at 12:50pm EDT.  Megsat is an
Italian technology development satellite launched in 2000 as one of several
payloads on a Russian Dniepr rocket.]

According to Moscow, the DAM will have only minor impact on the correct
orbit phasing for the upcoming Progress 11P.  [Since Progress 11P flight to
the ISS uses the seldom employed three-day template (instead of two days),
time available for determining any correction parameters and updating the
Progress autopilot is not that critical.]

For Soyuz 7S, in Fall 2003 for crew rotation, an orbit phasing burn will be
required.

The flight attitude assumed by the ISS for the 11P docking on 6/11 will
require temporary power-downs on both the US and Russian segments.  Details
are currently being worked.

At 1:00pm EDT and 1:12pm, TsUP conducted the planned Kurs approach/docking
radar tests on the DC-1 "Pirs" side, first subset 1, then subset 2.  Both
were successful.  [With this, fueling of the next Progress vehicle at
Baikonur is moving ahead.  Launch of 11P/Progress M1-259 (M1-10) is set for
6/8 (Sunday) at 6:34am EDT.  The cargo ship will fly a three-day ascent
profile, with docking scheduled for 6/11 (Wednesday) at 7:11am EDT.  Linkup
will be radially at the DC-1 port (Progress 10P remains at the axial SM
aft-end port, and Soyuz TMA-2 is at the FGB nadir port).  Total mass of 11P:
6934 kg (15287 lbs).]

Update on PCU (plasma contactor unit):   PCU-2 has been on Discharge since
5/16, for characterization of its performance, viz., its Cesium emission
current, at exit from orbital eclipse (Earth's shadow) under rapidly
changing exit latitudes, as is the case from late May to early June.  It
will remain on Discharg until 6/6, then switched to Standby.  [PCU emission
current is the sum of the electron currents collected from the ambient
ionosphere by (1) the high-voltage (160V) P6 solar arrays (when in ram
position) and (2) via low-voltage induction by the ISS structure moving
through the ionosphere.  The currently used FPP (floating potential probe)
instrument  data for determining the potential between ISS and the ambient
environment are very limited.  A more advanced Floating Potential
Measurement Unit (FPMU) will arrive on ULF-1.  The present PCU-2
characterization enables forward-work on extending and validating the plasma
charging model used by the ground for when the FPMU is in place.]

Today's CEO targets, limited in the current XPOP attitude by flight rule
constraints on the use of the Lab nadir/science window, were Industrialized
SE Africa (conditions favorable for industrial haze.  Looking right towards
the industrial heartland), Patagonian glaciers, Chile (northern ice fields
clear: looking right for detailed views of glacier tongues), Rio de Janeiro,
Brazil (nadir pass), Anatahan Volcano, N Marianas (Guam under volcano ash
alert for respiratory health reasons.  By today, the winds will probably
have reverted to a more normal westward flow, thereby removing the danger.
Looking left of track about three degrees), Western Mediterranean Haze
(conditions favorable for haze buildup, especially draining down the Rhone
and Ebro valleys [in France and Spain respectively], both left of track),
and Lower Amazon River Basin (looking left and right for detailed views of
this great estuary). CEO images can be viewed at the websites
http://eol.jsc.nasa.gov and http://earthobservatory.nasa.gov

U.S. and Russian Segment Status (as of 1:06pm EST).

Environmental Control and Life Support (ECLSS) and Thermal Control (TCS):

Elektron O2 generator is powered On (20 amp mode).  Vozdukh CO2 scrubber is
On (manual mode 5, see note above).  U.S. CDRA CO2 scrubber is Off.  TCCS
(trace contaminant control subsystem) is operating.  MCA (major constituents
analyzer) is operating.  BMP Harmful Impurities unit: absorbent bed #1 in
Purify mode, bed #2 in Purify mode.  RS air conditioner SKV-1 is On; SKV-2
is Off.
SM Working Compartment:  Pressure (mmHg) -- 742; temperature (deg C) --
26.2; ppO2 (mmHg) -- data invalid; ppCO2 (mmHg) -- data invalid.
SM Transfer Compartment:  Pressure (mmHg) -- 751; temperature (deg C) --
21.1.
FGB Cabin:  Pressure (mmHg) -- 748; temperature (deg C) -- 23.0.
Node:  Pressure (mmHg) -- 742.62; temperature (deg C) -- 24.7 (shell); ppO2
(mmHg) -- n/a; ppCO2 (mmHg) -- n/a.
U.S. Lab:  Pressure (mmHg) -- 744.61; temperature (deg C) -- 23.0; ppO2
(mmHg) -- 170.7; ppCO2 (mmHg) -- 3.4.
Joint Airlock (Equip. Lock):  Pressure (mmHg) -- 744.72; temperature (deg
C) -- 31.0; shell heater temp (deg C) -- 26.0, ppO2 (mmHg) -- n/a; ppCO2
(mmHg) -- n/a.
PMA-1:  Shell heater temp (deg C) -- 24.0.
PMA-2:  Shell heater temp (deg C) -- 11.7.

(n/a = data not available)

Propulsion System (PS): Total propellant load available: 3573 kg (7877 lb)
as of 5/29 [SM(774) + FGB(2547) + Progress(252)].  (Capability: SM -- 860
kg; FGB -- 6120 kg).

Electrical Power Systems (EPS):

Both P6 channels fully operational.  BGA (beta gimbal assembly) 2B and 4B
both "directed" (non-solar tracking) mode ("sun slicer" position, for drag
reduction).
SM batteries:  Batteries #4 is disconnected (failed); battery #8 has been
replaced, in "Cycle" mode; all other batteries (6) are in "Partial Charge"
mode (battery #2 is exhibiting degraded performance).
FGB batteries:  Battery #4 is disconnected; battery #5 is in "Cycle" mode;
all other batteries (4) are in "Partial Charge" mode.
Plasma Contactor Unit PCU-1 in Standby mode; PCU-2 in Discharge mode.

Command & Data Handling Systems:

C&C-1 MDM is prime, C&C-2 is back-up, and C&C-3 is in standby.
GNC-1 MDM is prime; GNC-2 is Backup.
INT-1 is operating; INT-2 is Off.
EXT-2 is On (primary), EXT-1 is Off (both now upgraded to R3).
LA-1, LA-2 and LA-3 MDMs are all operating.
PL-2 MDM is Off; PL-1 MDM is Operational.
APS-1 (automated payload switch #1) and APS-2 are both On.
SM Terminal Computer (TVM): 3 redundant lanes (of 3) operational. Being
upgraded.
SM Central Computer (TsVM): 3 redundant lanes (of 3) operational. Being
upgraded.

Attitude Control Systems:

3 CMGs on-line (CMG-1 failed).
State vector source -- U.S. SIGI-1 (GPS)
Attitude source -- U.S. SIGI-1 (GPS)
Angular rate source -- RGA-1

Flight Attitude:

XPOP (x-axis perpendicular to orbit plane = "sun-fixed" [yaw: 0.5 deg,
pitch: -6.8 deg., roll: 0 deg]), with CMG TA (thruster assist).
Solar Beta angle:  50.4 deg (magnitude decreasing).

Communications & Tracking Systems:

FGB MDM-1 is powered Off; FGB MDM-2 is operational.
All other Russian communications & tracking systems are nominal.
S-band is operating nominally (on string 2).
Ku-band is operating nominally.
Audio subsystem is operating nominally [IAC-1 (internal audio controller #1)
being analyzed after self-test error.  IAC-2 is prime.]
Video subsystem operating nominally.
HCOR (high-rate communications outage recorder) is operating nominally.

Robotics:

SSRMS/Canadarm2 based at MBS PDGF #1 with Keep Alive (KA) power on both
strings.
MBS: KA power on both strings.
MT: latched at WS4, with KA power.
POA: KA power on both strings.
RWS (robotics workstations): Lab RWS is Off; Cupola RWS is Off.

ISS Orbit  (as of this morning, 5:39am EDT [= epoch]):

Mean altitude -- 388.7 km
Apogee -- 392.8 km
Perigee -- 384.6 km
Period -- 92.33 min.
Inclination (to Equator) --  51.63 deg
Eccentricity -- 0.0006062
Orbits per 24-hr. day -- 15.60
Solar Beta Angle -- 50.4 deg (magnitude decreasing)
Mean altitude loss in last 24 hours -- 85 m
Revolutions since FGB/Zarya launch (Nov. '98)  -- 25807
For more on ISS orbit and worldwide naked-eye visibility dates/times, see
http://www.hq.nasa.gov/osf/station/viewing/issvis.html


----

Jacques :-)

Editor: www.spacepatches.info

------------------------------------------------------


